Latest update February 2nd, 2025 8:30 AM
Oct 26, 2012 Letters
Dear Editor,
Many citizens have been calling our Public Relations Office at City Hall with questions on building and construction works in the City. Quite a few have asked about building new houses and renovating existing ones. Perhaps, we need to do a special column, in our dailies, to inform homeowners about building and other aspects of city life. Until then, we would like to use this letter to share some basic information on building works in Georgetown.
First, no person, who is desirous of building, should begin any such operations, in the city, without the appropriate application to the City Engineer. Applications forms are available, at the City Engineer’s Department, City Hall Compound.
Second, those, who intend to erect a new building or alter or add to any existing building, or do any structural works to any building, must submit the application with three (3) copies of a plan of the new building or of the alterations or additions, to the existing building or of the structural work for approval by the City Engineer.
Also, citizens should note the following:-
• The approval by the City Engineer of a plan shall be in writing at the foot of the plan approved;
• The plan must state the purpose, for which the building is intended to be used;
• It must be drawn in ink on the appropriate material¯drawing paper or tracing linen of good quality and must be drawn to scale e.g.
a) Floor plans and elevations drawn to the 1/8 scale which is I” on plane represents 8’ 0’on the ground.
b) Site plans drawn to the 1/16 scale which is 1″ on plan represents 16’0’ on the ground.
• The plan should show the ground position and outline of the new building, the elevation and dimensions thereof and the distances of the walls from the boundary lines of the land, on which it is proposed to erect the same, and from every other building or erection, on that land. In the case of a new building of several storeys it shall give particulars of every storey;
• The plan must show the position and dimensions of every water closet, drain or other house connections on that line;
• In the case of alterations or additions to an existing building, the plan must show the position, outline and dimensions of every part of the alternations or additions intended to be made to the existing building and also comply with the afore-mentioned requirements. The existing portion of building must also be shown to relate existing building with the new addition and/or alteration.
• The plan should show any other reasonable particulars required by the City Engineer.
The City Engineer shall, within reasonable time, after he receives the plan signify in writing his approval or disapproval of the building operations to the person proposing to execute same.
Royston King
Public Relations Officer
Mayor and City Council
Feb 02, 2025
Kaieteur Sports-Olympic Kremlin, the star of Slingerz Stables, was named Horse of the Year at the One Guyana Thoroughbred Racing Awards held on Friday evening in Berbice. The Brazilian-bred...Peeping Tom Kaieteur News- The government stands like a beleaguered captain at the helm of a storm-tossed ship, finds itself... more
Antiguan Barbudan Ambassador to the United States, Sir Ronald Sanders By Sir Ronald Sanders Kaieteur News- The upcoming election... more
Freedom of speech is our core value at Kaieteur News. If the letter/e-mail you sent was not published, and you believe that its contents were not libellous, let us know, please contact us by phone or email.
Feel free to send us your comments and/or criticisms.
Contact: 624-6456; 225-8452; 225-8458; 225-8463; 225-8465; 225-8473 or 225-8491.
Or by Email: [email protected] / [email protected]