I refer to several recent letters in the newspapers, re the proposed Hope Canal Project especially the ones from the residents in the Douchfour/Anne Grove/Hope Areas as well as the one calling for a Feasibility Study to be carried out as to the viability of this project.
I was the first to bring to light the problems associated with this project.
First of all, I totally agree with the residents as they have a right to be concerned since the EDWC and all its problems are also now brought out into their backyards. I also agree that a detailed feasibility study is warranted under the circumstances.
NDIA has stated that the Foreign and Local Experts have determined that an Atlantic Outlet is required for the EDWC similar to the Land of Canaan Sluice (LOC) and should be located at the Hope. The local experts were not named.
The LOC is a 5-door high sill sluice capable of working 24 hours a day and discharging 2000 cusecs. This would be literally impossible to achieve for the Atlantic discharge.
As an experienced design and construction engineer I am still trying to comprehend how a high level canal would fit into a low sill discharge outlet sluice without compromising its discharge capabilities.
I am also trying to visualize not only the design but also the construction of the inlet sluice located between the crown dam and the conservancy dam as well as the design and merging in of the inlet sluice to the conservancy dam.
The soil in this area has literally zero shear stress i.e. the bearing capacity is zero. It will also be a construction nightmare for the contractor undertaking the project.
Mott McDonald has worked in Guyana before and I believe worked on the Boereserie Scheme where an entire sluice floated away during construction.
The sub-soil at Hope is also similar. I am not too sure about the role of the local consultants other than to provide surveys and geotechnical back up info to Mott McDonald.
Recently, the President lambasted both the local contractors and consultants generally for poor work and promised to institute monetary charges for poor performance.
Under the circumstances this is a costly project for Guyana and I feel the Consultants collectively should provide a Performance Bid Bond and or have appropriate Liability Insurance guaranteeing their design work against any failure. This is standard in the Consulting Engineering Industry.
NDIA should spell out its criteria for the design among them that the discharge sluice should operate as the LOC failing which the design will be considered a failure.
Any resort to open the either the Lama or Maduni Sluices after completion of the Project to relieve the EDWC and flooding the Mahaica residents should also be considered a failure since this project is primarily to prevent any such future releases.
Malcolm Alli
Mar 20, 2025
2025 Commissioner of Police T20 Cup… Kaieteur Sports- Guyana Police Force team arrested the Presidential Guards as they handed them a 48-run defeat when action in the 2025 Commissioner of Police...Peeping Tom… Kaieteur News- There was a time when an illegal immigrant in America could live in the shadows with some... more
Antigua and Barbuda’s Ambassador to the US and the OAS, Ronald Sanders By Sir Ronald Sanders Kaieteur News- In the latest... more
Freedom of speech is our core value at Kaieteur News. If the letter/e-mail you sent was not published, and you believe that its contents were not libellous, let us know, please contact us by phone or email.
Feel free to send us your comments and/or criticisms.
Contact: 624-6456; 225-8452; 225-8458; 225-8463; 225-8465; 225-8473 or 225-8491.
Or by Email: [email protected] / [email protected]